The popularity of Cellular Manufacturing and workcells has grown, fueled by the adoption of the Toyota Production System (TPS) and it's namesake, Lean Manufacturing. But, there are problems.

The developers of TPS, Taiichi Ohno and Shigeo Shingo, were pragmatists. The evolution of TPS was largely trial and error-- long on practice; short on theory. From their writing it is evident that Ohno and Shingo had a wonderful intuitive grasp of the system but their explanations of the why behind it are a bit muddled and somewhat rare. As a result, much of what came from Toyota is in the form of rules and edicts that reflect what worked and what did not. Rules and edicts also helped propagate the system throughout Toyota and the supplier base.

The really big problem involves volume and variety. Toyota's U-shaped, balanced workcells do not work when orders are unpredictable, routings vary and work balance changes.

Group Technology workcells manufacture many products that are similar, but not identical. In job shop situations a cell may produce hundreds of different parts. Demand is often erratic and no single part has enough volume for its own cell.

A more fundamental approach to cell design is necessary and the results may look very different than the Toyota model. You can learn more about this from our page on Workcell Design or by downloading the workcell design chapter from Mr. Lee's next book. We also offer a seminar on Cellular Manufacturing.

Workflow

In a GT cell operations and sequence often vary. Some parts require machines 1,2,7 and 9 in that order. The next part may require machines 1,2,3 and 6. The average work time at each machine varies. Work times also change from part number to part number.

Process Technology

GT workcells usually favor smaller-scale, less automated process technologies that changeover easily and fit the lower volumes. Machine shops are an exception. CNC machining fits very well with GT cells. CNC technology does not really cut metal faster, it reduces setup and combines operations.

Batch Size

As in the Toyota system, small batches are better. But the high variety may not allow the kind of setup reductions that we can achieve with only a few products. Moreover, customers often order in lots and the batch size must reflect this. As a result, production batches tend to be larger and more varied than in a Toyota cell but still much smaller than in functional arrangements. For more on this, see "Lean Lot Sizing."

Transfer Batch

The transfer batch or internal lot size also tends to be larger than in Toyota cells. This is the number of pieces moved together between operations. The inventory in the transfer batch must be large enough to balance operations within the cell.

GT cells are often larger than Toyota cells. The greater distances between workstations require a larger transfer batch to amortize travel time over more pieces. One piece flow may not work.

Layout

Toyota strongly favors U-shaped layouts that give direct material flow and allow operators to balance their work in several ways. This is very sensible when the routes are all identical. GT cells should be designed around the most common workflow routes but they must also accommodate less common routings. This gives rise to unusual arrangements such as L-shapes and X-shapes

Group Technology (GT) workcell exampleGroup Technology Workcell Example

This cell has the classic U-shape but it does not operate like a Toyota Cell. This cell produces about 85 different turned parts. These are shafts and shafts with integral pinions and/or splines. Arrows show the sequence for three of these many parts.

All parts have dedicated carts for handling and storage. They serve as material handling devices, containers and kanban. Perimeter carts are a kanban stockpoint.

The internal lot size (transfer batch) is one cart (16 parts). External lot size varies from 16-48 parts in multiples of 16.

Work times are highly variable and unbalanced. The hobbing machine (7-1) is extremely slow while the NC lathe is fast. The product mix was carefully selected to include some parts that require hobbing and many others that do not.

Operators schedule their work from kanban signals. They must schedule non-hobbed parts immediately after a hobbed part. If they did not, the slow hobber would bring output to a crawl. They may have 2-3 part numbers underway at the same time.

Operators stay alert because the variation in cycle time means that machines finish at unforeseen moments. Operators constantly move from one machine to another, loading and unloading. Small queues highlight temporary bottlenecks which get special attention.

Some drilling and milling might have been done on the NC lathe using special attachments. But, we chose to make these secondary operations to reduce machine time on the lathe. These operations occur internally to lathe turning and cell output increases as a result.

While the whole arrangement may seem like a recipe for chaos, it actually works quite well. It is not nearly as smooth as a classic Toyota cell but it is far better than the genuine chaos of a functional layout.

A lot depends on the operators. Here, they were skilled and experienced machinists. With kanban, we knew they could figure out what part to run.

Another GT Workcell Example (Assembly/Fab)


IRANI, SHAHRUKH A., Handbook of Cellular Manufacturing Systems, Wiley, New York, 1999.

LEE, QUARTERMAN, Facilities & Workplace Design, Engineering & Management Press, Norcross, Georgia, 1997.

SURESH, NALLAN C. AND KAY, JOHN M.,Group Technology and Cellular Manufacturing, Klewer Academic Publishers, Boston, 1998.

KAMRANI, ALI K., PARSAEI, HAMID R. AND LILES, DONALD H., Planning Design & Analysis of Cellular Manufacturing Systems, Elsevier, New York, 1995.

WRENNALL, WILLIAM, AND LEE, QUARTERMAN, Handbook of Commercial and Industrial Facilities Management, McGraw Hill, August, 1993.

'End Page

■ ■ ■ ■ ■ ■ ■

Value Stream & Process Mapping

The Strategos Guide To Value Stream and Process Mapping goes  beyond symbols and arrows. In over 163 pages it tells the reader how to do it and what to do with it.

Buy Book

Lean Briefing Newsletter

The free newsletter of Lean strategy

Subscribe to Lean Briefing Newsletter
Strategos Books & Videos